Last modified: 2014-06-18 14:50:26 UTC
When scheduling a recurrent report the 1st run of the report is not kicked right away. The UI then, until the 1st recurrent report runs, displays a link to the report that is just a 404. The 1st recurrent run of the report should be scheduled right away.
Change 138109 had a related patch set uploaded by Nuria: [WIP] 1st run of recurrent report is scheduled right away https://gerrit.wikimedia.org/r/138109
Change 138109 merged by Milimetric: 1st run of recurrent report is scheduled right away https://gerrit.wikimedia.org/r/138109